Saturday, 21 December 2013

kolkata tram...........

                             Kolkata tram

   

Kolkata tram

The Kolkata tram is a tram system in Kolkata, India, run by the Calcutta Tramways Company (CTC). It is currently the only operating tram network in India and the oldest operating electric tram in Asia, running since 1902.

kolkata tram

History

An attempt was made in 1873 to run a 2.4-mile (3.9 km) tramway service between Sealdah and Armenian Ghat Street on 24 February. The service was not adequately patronised, and was discontinued on 20 Nov. In 1880, the Calcutta Tramway Co. Ltd was formed and registered in London on 22 December. Metre-gauge horse-drawn tram tracks were laid from Sealdah to Armenian Ghat via Bowbazar Street, Dalhousie Square and Strand Road. The route was inaugurated by the Viceroy, Lord Ripon, on 1 November. Steam locomotives were deployed experimentally in 1882 to haul tram cars. By the end of the nineteenth century the company owned 166 tram cars, 1000 horses, seven steam locomotives and 19 miles of tram tracks. During 1900, Electrification of the tramway, and reconstruction of tracks to 4 ft 8 12 in (1,435 mm) (standard gauge) began to happen. The first electric tramcar in Asia ran in 1902 from Esplanade to Kidderpore on 27 March, and on 14 June from Esplanade to Kalighat.[citation needed] The Kalighat line was extended during 1903 to Tollygunge, the Esplanade line to Belgachhia (via Bidhan Sarani, Shyambazar), and the Esplanade to Shialdaha route (via Binay Badal Dinesh Bag, Rajib Gandhi Sarani and [present] Mahatma Gandhi Road) opened.[citation needed]
Esplanade to Bagbazar route through College Street opened in 1904.[citation needed] During 1905, Howrah Station to Bandhaghat route was opened to trams in June. Electrification project completed. Bowbazar Junction to Binay Badal Dinesh Bag, Ahiritola Junction to Hatibagan Junction routes opened during 1906.[citation needed] Lines to Shibpur via G.T. Road were prepared in 1908. Esplanade to Shialdaha station via Moula Ali Junction, Moula Ali Junction to Nonapukur, Wattganj Junction to J.Das Park Junction (via Alipur), Mominpur Junction to Behala routes opened. Sealdah Station to Rajabazar route opened during 1910. Mirzapur Junction to Bowbazar Junction and Shialdaha Station to Lebutala Junction routes opened during 1915. In 1920 the Strand Road Junction to High Court route opened. S.C.Mallik Square Junction to Park Circus route (via Royd Street, Nonapukur) opened during 1923. The Barhabazar Junction to Nimtala route opened in 1925. During 1928, the Kalighat to Baliganj route opened. The Park Circus line extended to Garhiahat Junction in 1930. The Rajabazar line extended to Galiff Street during 1941.[citation needed] The Calcutta system was well connected during 1943 with the Howrah section through the new Howrah Bridge in February. With this extension, the total track length reached 42.0 miles (67.59 km).
During 1951, the government of West Bengal entered into an agreement with the Calcutta Tramways Company, and the Calcutta Tramways Act of 1951 was enacted. The government assumed all rights regarding the Tramways, and reserved the right to purchase the system (with two years' notice) on 1 January 1972 or any time thereafter. The Government of West Bengal passed the Calcutta Tramways Company (Taking Over of Management) Act and assumed management on 19 July 1967. On 8 November 1976 the Calcutta Tramways (Acquisition of Undertaking) ordinance was promulgated, under which the company (and its assets) united with the government.The Howrah sections were closed in October; the 1971/1973 Nimtala route was closed down in May 1973, and realignment of the Howrah Station terminus occurred. Total track length was now reduced to 38 miles (61.2 km).Tram tracks on Bentinck Street and Ashutosh Mukhopadhyay Road closed during 1980 for construction of the Kolkata metro; following construction, these stretches were not reopened. Overhead wires were present until 1994 on Bentinck Street. Tracks on Jawaharlal Nehru Road remained after realignment, making a new terminus at Birla Planetarium; the Birla Planetarium route closed in 1991[citation needed]. An overpass was constructed on that road in 2006[citation needed]. The Sealdah Station terminus (along with the Sealdaha – Lebutala stretch on Bipin Bihari Gangopadhyay Street) closed for construction of an overpass in 1982. The site is now occupied by Sealdah Court and a bus terminal.[citation needed] On 17 April 1985, tracks were extended connecting Manicktola to Ultadanga via Manicktola Main road and C. I. T. Road 3.7 km (2.30 mi). This was the first Tramways extension since 1947.
On 31 December 1986, further extension of tram tracks from Behala to Joka was completed. In 1993, the Howrah Station terminus closed and tram tracks removed on Howrah Bridge; the cantilever bridge proved too weak for trams.[citation needed] All routes terminated there were shortened to the Barhabazar (Howrah Bridge) terminus (formerly Barhabazar Junction).[citation needed] The High Court terminus closed for reconstruction of Strand Road in 1995. Rails and wires were removed from there and from Strand Road, Hare Street and Shahid Kshudiram Basu Road.[citation needed] The site is now occupied by the newest building of the Kolkata High Court. During 2004, the Garhiahat Depot – Garhiahat Junction link on Gariahat Road closed for construction of the Gariahat overpass.[citation needed] The Mominpur – Behala stretch on Diamond Harbour Road closed in 2006 for construction of an overpass at Taratala.[citation needed] Initially, there was a plan to route tracks on that overpass after its completion, but the road was later converted to a National Highway and the plan dismissed.[citation needed]
During 2007, the Wattgunge Junction – Mominpur Diamond Harbour Road, Mominpur – Jatin Das Park Judges Court Road, Jatin Das Park – Kalighat Shyama Prasad Mukherjee Road routes temporarily closed for reconstruction.[citation needed] The Galiff Street terminus was realigned during 2008.[citation needed] Irregular service from Bagbazar to Galiff Street converted to regular by Route 7/12.[citation needed] Rails and wires removed from part of Bidhan Sarani route (restored by end of year). The Tracks on R. G. Kar Road from Shyambazar five-point crossing to Belgatchia tram depot temporarily closed down for reconstruction during 2009.[citation needed] During 2011, the Joka-Behala stretch and Behala depot closed down for construction of the Joka-BBD Bag metro project while the Ballygunj-Kalighat stretch and Lalbazar-Mirjapur down line closed for reconstruction.[citation needed] On 10th October 2013, the Tollygunge-Esplanade tram route reopened after it was closed for seven years when the route was concretised. 

 

 

 


No comments:

Post a Comment